Tijuana Baja California

- Parking electrification
- Crane maneuvers for poster placement
- Installation of 6” removable safety posts, pedestrian corridor and road
- Replacement of concrete ramp with resistance of 250kg/cm2
- Manufacture and installation of hatches with security doors
- Interlock system for personnel access doors.
- Assembly of sensors, magnetic plates and colored turrets for visual support
- Installation of type L copper pipe for nitrogen
- Remodeling of Tablaroca wall for installation of drying ovens.

Development:

- Installation of metal doors
- Installation of 220v and 120v downpipes
- Installation of switches and lights
- Installation of nitrogen lines
- Relocation of fire extinguisher cabinet
- Insulpanel installation
- Installation of urinals
- Parking lighting
- Shoe manufacturing

FONDO.png
FONDO.png
WhatsApp Image 2023-01-11 at 3.51.59 AM (1)
WhatsApp Image 2023-01-11 at 3.52.00 AM (1)
WhatsApp Image 2023-01-11 at 3.52.00 AM (2)
WhatsApp Image 2023-01-11 at 3.52.00 AM (3)
WhatsApp Image 2023-01-11 at 3.52.00 AM (5)
WhatsApp Image 2023-01-11 at 3.52.00 AM (4)
FONDO.png
FONDO.png
FONDO.png
QR_curriculum

©2024 by DCElectromechanics. Powered and secured by ON-TECH Support

  • WhatsApp
  • Facebook
bottom of page