POWERMEX
Project:
Date:
Location:
Facilities
April 2023
Tijuana Baja California
- Parking electrification
- Crane maneuvers for poster placement
- Installation of 6” removable safety posts, pedestrian corridor and road
- Replacement of concrete ramp with resistance of 250kg/cm2
- Manufacture and installation of hatches with security doors
- Interlock system for personnel access doors.
- Assembly of sensors, magnetic plates and colored turrets for visual support
- Installation of type L copper pipe for nitrogen
- Remodeling of Tablaroca wall for installation of drying ovens.
Development:
- Installation of metal doors
- Installation of 220v and 120v downpipes
- Installation of switches and lights
- Installation of nitrogen lines
- Relocation of fire extinguisher cabinet
- Insulpanel installation
- Installation of urinals
- Parking lighting
- Shoe manufacturing

![]() | ![]() | ![]() |
---|---|---|
![]() |

![]() | ![]() | ![]() |
---|---|---|
![]() | ![]() | ![]() |
![]() | ![]() | ![]() |
![]() | ![]() | ![]() |
![]() | ![]() | ![]() |
![]() |